LG Chem — Columbus project

UIBS is a proud Mechanical Contractor for the LG Chem Columbus Project, collaborating with trade partners to support milestone delivery on one of the region’s major industrial programs.

Approach: innovative execution to meet milestone schedules while reducing unnecessary cost through vigorous value engineering — without compromising safety or quality. Field scopes include M.E.P. construction, VT hookups, panel fabrication, and site preparation.

Completed · Prosperity, SC

KRA Manufacturing Facility

KRA (기린정밀) Manufacturing Facility in Prosperity, South Carolina — a 315,000 sqft industrial program delivered over 19 months on a $37.5M budget.

UIBS served as Construction Manager (Owner’s Rep) and delivered HVAC, IT, BMS/BAS, and machine installation scopes, working alongside GC THS Constructors for owner KRA.

Project facts

Budget $37,500,000
Area 315,000 sqft
Duration 19 months
Location Prosperity, SC

UIBS roles

CM (Owner’s Rep)
HVAC · IT · BMS/BAS
Machines

Results

Certificate of Occupancy obtained 3 months early
7% savings from budget